Month: November 2020

Employee of the Month – October 2020

Ashley won October employee of the month for his exemplary work ethic and effort. Thank you Ashley for your hard work.

Read this news story
Cavity Stop Sock

ARC Cavity Stop Sock restricts the spread of smoke and flames within the cavity of external masonry walls.

Read this news story
TCB

ARC TCB restricts the spread of smoke and flames within the cavity of timber frame walls, while also minimising the effect of flanking noise pollution.

Read this news story
Party Wall DPC

ARC Party Wall DPC enables the closing of an external cavity at either party wall or party floor junctions where building regulations require the use of mineral wool closer for...

Read this news story
T-Barrier for Masonry Construction

The ARC T-Barrier is designed to provide a fire, thermal and acoustic break at the junction between the external cavity and the party wall cavity.

Read this news story
T-Barrier for Timber Frame

ARC T-Barrier enables the closing of an external cavity at a party wall junction.

Read this news story
T-Barrier Metal Frame

ARC T-Barrier Metal Frame is a 3-piece system that fits into and around the metal ‘C’ sections.

Read this news story
T-Barrier for Pitched Roof

The ARC T-Barrier Pitched Roof is designed to provide a fire, thermal and acoustic barrier between the top of the party wall blockwork and the underslaters felt.

Read this news story
Tile Batten Barrier

The ARC Tile Batten Barrier is designed to provide a fire, thermal and acoustic break at the party wall...

Read this news story
Business As Usual During Lockdown

We want to assure all our customers that ARC will be fully operational during the COVID-19 lockdown.   As we manufacture product for an essential industry, our factory is continuing...

Read this news story
Soffit Slab

ARC Soffit Slab is designed to fill the void within the soffit, providing a fire, thermal and acoustic barrier between dwellings.

Read this news story
Spandrel Barrier

ARC Spandrel Barrier seals the top of the party wall cavity, allowing a zero U-value to be achieved when used in conjunction with ARC T-Barrier vertically.

Read this news story